Lucent Technologies Lineage
®
2000 ECS/GPS Battery Plant J85500G-2
4 - 2 Installation
Issue 6 May 1999
•
Equipment to handle shipping containers, remove
framework from shipping containers, and erect framework
into final position. Minimum lifting capacity: 450 lbs.
•
Common electrician’s hand tools.
•
Proper crimping tools and dies for connectors used.
•
Common mechanic’s hand tools.
•
18mm or 3/4-inch drill to bore holes for floor anchors.
•
DMM (Digital Multimeter) with at least 0.05 % accuracy
on the dc scale.
•
DC Dummy Load Bank rated for 75 amperes minimum at
60 volts dc. For LVD/R option only: Power supply, variable
from 0 to 60 volts dc at 2 amperes. Supply should have both
coarse and fine output controls.
•
For LVD/R option only: Six clip leads each capable of
carrying 3 amperes.
Suggested
installation
sequence
1. The plant is wired with ac from the right side. Typical
routing of ac, dc and control cabling is shown on the plant
assembly drawing, J85500G-2. Connection points and
wire types are indicated on the plant wiring diagram,
T-82673-31.
2. All dc leads should be separated wherever possible from ac
leads to minimize electrical noise transmitted to the load.
3. Pair the battery potential lead with the associated return
lead of a given circuit for as much of the run as possible.
4. All control leads and other small gauge wiring should be
separated from the ac and dc power leads to prevent
physical damage. (Routing of control leads within the
controller is described in the Controller manual.)
5. All bolts making electrical connections should be torqued
to the values in Table 4-A; all bolts for mechanical
connections should be torqued to values in Table 4-B.
Sequence of
tasks
Table 4-C lists the drawings, manuals and other documentation
that are necessary to complete the following sequence of tasks.