![Loren Cook HVAD 2020 Installation & Operation Manual Download Page 19](http://html1.mh-extra.com/html/loren-cook/hvad-2020/hvad-2020_installation-and-operation-manual_1939674019.webp)
19
PURLIN MOUNT
PURLIN MOUNT
1. From an accessible landmark, on the first purlin, measure to the
centre line of the bottom centered hole of the 3 mounting holes.
2. Drill the centered bottom mounting hole with a ½” drill bit, so
that there will be a minimum of ¾” (19mm) between the top of
the (EN562X1152) mounting bracket deck and the bottom of the
purlin.
3. Place the two mounting bracket faces together with each bracket
bottom deck face outward.
4. Before fastening the mounting brackets install four ¼” x 1
1/4” long hex cap screws (EN823X6031) with ¼” flat washers
Summary of Contents for HVAD 2020
Page 1: ...1 Installation Installation Operation Operation User Guide User Guide HVAD HVAD...
Page 10: ...10 CLEARANCES CLEARANCES...
Page 32: ...32 INPUT INPUT 120 240V 2 9 1 45A 1 PH 120 240V 2 9 1 45A 1 PH 50 60HZ 50 60HZ LED LED 25W 25W...
Page 40: ...2015 E Dale St Springfield MO 65803 417 869 6474 lorencook com...