Setup and transport
- 36 -
10.13
10 Setup and transport
Danger of injury due to the de-
vice falling over and crashing .
When transporting using mechani
-
cal lifting equipment (e.g. crane,
etc.), only the hoisting points
shown here may be used. Use
suitable load-carrying equipment.
Each lifting point must be loaded
separately. Do
NOT
, for example
put one load strap through both
handles, as this could lead them
to be pulled together and cause
breakage!!
Do not use a fork-lift truck or simi
-
lar device to lift the machine by its
housing.
Remove the gas cylinder from the
welding machine before transpor
-
tation .
The machine must be transported
or set up only on firm, level sur
-
faces. The maximum admissible
angle of inclination for setting up or
transporting is 10°.
minimum
1,22 m
Lifting point for 4-point hoisting of the
M-Pro
Summary of Contents for M-Pro BasicPlus
Page 43: ...Before start up 43 10 13 ...
Page 71: ...Antes de la puesta en funcionamiento 71 10 13 ...
Page 99: ...Voor de inbedrijfstelling 99 10 13 ...
Page 157: ...Avant la mise en service 157 10 13 ...
Page 185: ...Před uvedením do provozu 185 10 13 ...
Page 213: ...Prima di cominciare 213 10 13 ...
Page 287: ...Ersatzteilliste spare parts list Список деталей 287 10 13 ...