TO 1C-5M-2-1S-2
1.
Page xvi, LIST OF TIME COMPLIANCE TECHNICAL ORDERS of the basic manual is amended, as a
result of TO 35D3-3-84-503, to add the following:
TO No.
Date
Title
35D3-3-84-503
29 July 2016
Modification of C-5M Engine
Handling System from Part
Number A5441-20FRK to Final
Configuration MA9441-20FJR
2.
Page 2-55, paragraph 2.7.13 of the basic manual is amended to change the bootstrap beam and saddle
adapter set from Part Number AGSE-B015-G02 to Part Number AGSE-B015-G03.
3.
Page 2-55, paragraph 2.7.13 of the basic manual is amended, as a result of TO 35D3-3-84-503, to delete
the phrase ‘‘(manual or pneumatic)’’ from the fourth and sixth sentences.
4.
Page 2-55, paragraph 2.7.13 of the basic manual is amended, as a result of TO 35D3-3-84-503, to add a
new paragraph 2.7.13A to read as follows:
2.7.13A
Engine Handling System. The engine handling system (P/N MA9441-20FJR) is designed to pro-
vide lifting and lowering of an F138 Engine during engine removal and installation. The engine handling
system consists of two 6-ton manual lever hoists, two 3-ton manual lever hoists, four dynamometers, and a
reusable storage/shipping container. The engine handling system is used in combination with the bootstrap
beam and saddle adapter set which attaches to the engine pylon. Two dynamometers attach to the forward
bootstrap beam. The remaining two dynamometers attach to eyelets on the aft bootstrap beam cable. The
two 6-ton hoists are atached to the dynamometers on the forward bootstrap beam. The two 3-ton hoists are
attached to the dynamometers on the aft bootstrap beam. See TO 1C-5M-2-4JG-1-3, Chapter 2.
THE END
2
Summary of Contents for C-5M
Page 12: ...TO 1C 5M 2 1S 1 Figure 1 21 Circuit Breaker Locations Sheet 6 10...
Page 13: ...TO 1C 5M 2 1S 1 Figure 1 21 Circuit Breaker Locations Sheet 13 11...
Page 14: ...TO 1C 5M 2 1S 1 Figure 3 34 Crew Lavatory Waste Servicing AF68 0213 AF68 0216 and AF69 0024 12...
Page 15: ...TO 1C 5M 2 1S 1 Figure 3 34 1 Tank Cleaning Adapter 13...
Page 16: ...TO 1C 5M 2 1S 1 Figure 3 34 2 Toilet Maintenance Switch 14...
Page 32: ......
Page 40: ......
Page 82: ...Figure 1 1 Airplane Dimensions TO 1C 5M 2 1 1 42...
Page 83: ...Figure 1 2 Major Component Weights Sheet 1 of 3 TO 1C 5M 2 1 1 43...
Page 84: ...Figure 1 2 Major Component Weights Sheet 2 TO 1C 5M 2 1 1 44...
Page 85: ...Figure 1 2 Major Component Weights Sheet 3 TO 1C 5M 2 1 1 45...
Page 86: ...Figure 1 3 Airplane Stations Sheet 1 of 8 TO 1C 5M 2 1 1 46...
Page 87: ...Figure 1 3 Airplane Stations Sheet 2 TO 1C 5M 2 1 1 47...
Page 88: ...Figure 1 3 Airplane Stations Sheet 3 TO 1C 5M 2 1 1 48...
Page 89: ...Figure 1 3 Airplane Stations Sheet 4 TO 1C 5M 2 1 1 49...
Page 90: ...Figure 1 3 Airplane Stations Sheet 5 TO 1C 5M 2 1 1 50...
Page 91: ...Figure 1 3 Airplane Stations Sheet 6 TO 1C 5M 2 1 1 51...
Page 92: ...Figure 1 3 Airplane Stations Sheet 7 TO 1C 5M 2 1 1 52...
Page 93: ...Figure 1 3 Airplane Stations Sheet 8 TO 1C 5M 2 1 1 53...
Page 94: ...Figure 1 4 Danger Areas Sheet 1 of 17 TO 1C 5M 2 1 1 54...
Page 95: ...Figure 1 4 Danger Areas Sheet 2 TO 1C 5M 2 1 1 55...
Page 96: ...Figure 1 4 Danger Areas Sheet 3 TO 1C 5M 2 1 1 56...
Page 97: ...Figure 1 4 Danger Areas Sheet 4 TO 1C 5M 2 1 1 57...
Page 98: ...Figure 1 4 Danger Areas Sheet 5 TO 1C 5M 2 1 1 58...
Page 99: ...Figure 1 4 Danger Areas Sheet 6 TO 1C 5M 2 1 1 59...
Page 100: ...Figure 1 4 Danger Areas Sheet 7 TO 1C 5M 2 1 1 60...