21
C
33
FLUE SYSTEM SPECIFICATION
MANUFACTURER MUELINK & GROL
TEMPERATURE CLASS T120
FLUE GAS MATERIAL PP
EACH VERTICAL CONCENTRIC FLUE ASSEMBLY IS SUPPLIED WITH THE FOLLOWING ITEMS:
CONCENTRIC VERTICAL TERMINAL Ø80/125MM PP
CONCENTRIC EXTENSION Ø80/125mm (500mm) PP CUT TO LENGTH
ADDITIONAL FLUE ITEMS ARE AVAILABLE SEE FLUE ASSEMBLY AND ANCILLARIES GUIDE AT
WWW.LOCHINVAR.LTD.UK
8.6.5
C
33
vertical concentric flue assembly
Model
Description
Flue Assembly Item number
EF80
Vertical Concentric flue kit 80/125mm
EFVF002
EF100
Vertical Concentric flue kit 100/150mm
EFVF004
EF120
Vertical Concentric flue kit 100/150mm
EFVF004
EF150
Vertical Concentric flue kit 130/200mm
EFVF005
EF180
Vertical Concentric flue kit 130/200mm
EFVF005
8.6.6
C
33
vertical concentric flue assemblies
8.6.7
Vertical terminal installation
When the heater is installed as a Type C
33
appliance, the flue system should be installed as follows:
1.
Confirm that the roof flashing is correct for the type of roof through which the terminal is to be installed. (See Section 8.11)
2.
Determine the desired location for the flue terminal, taking into account minimum distances as detailed in Section 8.3.1 and the
relevant British Standards.
3.
Taking care to protect the appliance from debris and dust, drill a hole in the desired location. The diameter of the hole should be no
more than 10mm greater than the diameter of the air supply pipe of the terminal.
NOTE: The hole should be drilled from the outside to ensure that no damage is done to the roofing material. Extra care should be
taken to ensure that the hole is drilled vertically.
4.
Install the roof flashing and secure as appropriate.
5.
Carefully insert the roof terminal through the roof flashing and hole in the roof.
NOTE: When inserting the roof terminal do not support or turn the terminal using the cap.
6.
Ensure the terminal is vertical using a spirit level.
7.
Fit the support bracket around the terminal and secure using appropriate fixings. Do not tighten the support bracket.
8.
Install the remainder of the flue system working progressively away from the Water heater supporting the pipes as necessary.
9.
Once the flue system is fully installed, tighten the clamp to secure the terminal in place.
Summary of Contents for EcoForce EF100
Page 2: ...2 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 30: ...30 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 33: ...33 ...
Page 119: ...119 ...
Page 120: ...120 ...