CHAPTER 4: OPERATION
3
MOVE S2
When worn out, the pusher holding rolls must be replaced:
1.
Remove the rest cover located at the front of the bar feeder.
2.
Loose the holding screws (A).
3.
Remove the rolls (B).
4.
Install the new ones.
5.
Tighten the screws (A).
6.
Put back the rest cover.
Please read the safety instructions provided at the beginning of this manual before
handling the following devices.
Particular attention should be given to the handling of electrical elements because of risks
of electrocution. In case of possible electrical malfunctions, it is advisable to contact LNS
or its local representative.
This chapter contains all of the elements regarding the electrical circuit of the bar feeder. The electrical
parts, and groups, which may require a setting, at some time or other, are described herein in detail.
Whenever possible, the article numbers of the elements are shown in tables below each drawing. When a
group of elements is indicated, look for the element and then write down the ordering number of the
desired element.
Summary of Contents for QUICK SIX S2
Page 1: ......
Page 2: ...MOVE S2...
Page 3: ...MOVE S2...
Page 4: ...MOVE S2...
Page 5: ...CHAPTER 1 BASIC NOTIONS 3 MOVE S2...
Page 13: ...CHAPTER 2 TECHNICAL DATA 11 MOVE S2...
Page 15: ...CHAPTER 2 TECHNICAL DATA 13 MOVE S2...
Page 16: ...14 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 18: ...16 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 17 MOVE S2...
Page 33: ...CHAPTER 4 OPERATION 31 MOVE S2...
Page 57: ...CHAPTER 4 OPERATION 1 MOVE S2...
Page 60: ...4 CHAPTER 4 OPERATION MOVE S2...
Page 73: ...CHAPTER 4 OPERATION 17 MOVE S2...
Page 75: ...CHAPTER 4 OPERATION 1 MOVE S2...