CHAPTER 3: SETTING INTO OPERATION
23
MOVE S2
Once the bar feeder is in place, and perfectly aligned, it should be anchored to the ground to make it
stable. To accomplish this, 8 anchorage points (A) have been provided.
8 anchorage bolts (B) must be furnished by the client (min. M10 x 100 mm / 1/2" x 4").
Once the anchoring bolts are tightened, check the alignment again, and correct it if necessary.
Tighten the nuts of the leveling screws.
Summary of Contents for QUICK SIX S2
Page 1: ......
Page 2: ...MOVE S2...
Page 3: ...MOVE S2...
Page 4: ...MOVE S2...
Page 5: ...CHAPTER 1 BASIC NOTIONS 3 MOVE S2...
Page 13: ...CHAPTER 2 TECHNICAL DATA 11 MOVE S2...
Page 15: ...CHAPTER 2 TECHNICAL DATA 13 MOVE S2...
Page 16: ...14 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 18: ...16 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 17 MOVE S2...
Page 33: ...CHAPTER 4 OPERATION 31 MOVE S2...
Page 57: ...CHAPTER 4 OPERATION 1 MOVE S2...
Page 60: ...4 CHAPTER 4 OPERATION MOVE S2...
Page 73: ...CHAPTER 4 OPERATION 17 MOVE S2...
Page 75: ...CHAPTER 4 OPERATION 1 MOVE S2...