20
CHAPTER 3: SETTING INTO OPERATION
MOVE S2
Insert the two bars (B) delivered with the bar feeder into the holes of the lifting plates.
Place the hoist vertically above the bar feeder.
Place the straps over the ends of the bars (B), and then attach them to the hoist.
Raise the hoist to tighten the straps.
Remove the screws (A) holding the bar feeder to the pallet during transportation.
Lift the bar feeder and remove the pallet. Ensure that the bar feeder is balanced!
Move the bar feeder, taking care that it remains horizontal and that no one is nearby or under the
suspended load.
Do not knock the bar feeder as you move it; this may damage it.
Place the bar feeder behind the lathe, as close as possible and in approximate alignment with the
spindle. For the placement, the stationary and mobile space requirements for the lathe and the bar
feeder should be taken into account. When placing the bar feeder, insert leveling plates under the
feet.
The distance between the lathe and the bar feeder should not exceed 20 mm. Should an
obstacle impose a greater distance, contact LNS or its local representative.
The area around the lathe and the bar feeder must be cleared to allow for their
maintenance and handling. It should remain clear after the installation is completed.
Summary of Contents for QUICK SIX S2
Page 1: ......
Page 2: ...MOVE S2...
Page 3: ...MOVE S2...
Page 4: ...MOVE S2...
Page 5: ...CHAPTER 1 BASIC NOTIONS 3 MOVE S2...
Page 13: ...CHAPTER 2 TECHNICAL DATA 11 MOVE S2...
Page 15: ...CHAPTER 2 TECHNICAL DATA 13 MOVE S2...
Page 16: ...14 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 18: ...16 CHAPTER 2 TECHNICAL DATA MOVE S2...
Page 19: ...CHAPTER 3 SETTING INTO OPERATION 17 MOVE S2...
Page 33: ...CHAPTER 4 OPERATION 31 MOVE S2...
Page 57: ...CHAPTER 4 OPERATION 1 MOVE S2...
Page 60: ...4 CHAPTER 4 OPERATION MOVE S2...
Page 73: ...CHAPTER 4 OPERATION 17 MOVE S2...
Page 75: ...CHAPTER 4 OPERATION 1 MOVE S2...