
Operating Manual
Cross-flow fan unit type GSG-NV1 / 2
50 - 64
010980-26-E BA GSG-NV1_2 / 23.03.2012
First oil change of approx. 50 hours of operation, or at the end of
the season.
Further oil changes after every 500 hours of operation, or at the
end of the season.
Use SAE 20W 40 oil: quantity = 1.35 l
Check the membranes annually for damage; if they need to be
replaced, use only
LIPCO original replacement parts
.
Air receiver:
Valve for pressure check of air
receiver.
Set the pressure of the air re-
ceiver to approx. 20% of the
spraying pressure and check
occasionally.
Fig. 38
Pump pressure control valve:
Safety button
If the pump safety control valve
is activated for any reason,
then push the safety button in
all the way after eliminating the
cause.
Fig. 39
Check all hydraulic connections, chains, springs and spray hose
connections regularly to ensure that they are tight.