
Operating Manual
Cross-flow fan unit type GSG-NV1 / 2
35 - 64
010980-26-E BA GSG-NV1_2 / 23.03.2012
Commercially available anti-foaming agents can be used. Alter-
natively, it is also possible to add 0.02 l of rapeseed oil or salad
oil for each 1000 l of spray liquid.
Important:
After spraying, the recycling injector should remain in operation
until the tunnel collector is completely empty.
Afterwards, switch off the recycling unit at the control box, and
then switch off the universal joint shaft. This sequence prevents
dripping of the spray liquid into the tunnel collector.
Control box:
The picture illustrates a control
box. The switches can differ
depending on the functions or-
dered.
(Fig. 25)
The return line leads from the
injector through the recycling
filter to the spray tank.
The injectors are switched on
and off via the control box.
Fig. 25
Important:
The recycling injectors operate at a minimum pressure of 5 bar.