Site Preparation
When installing a Lincoln Electric CNC Cutting System in your shop, there are many factors that will influence the
potential productivity, ease of use of the machine and the safety of the operator. The main factors to prepare for
include: the physical placement of the machine, the availability of power, an EMI ground, compressed air, other
input gases, and ventilation.
Please Note:
•
When preparing to install the Lincoln Electric CNC Cutting System, provide sufficient space. Three feet of work
space (914 mm) should be obstacle free around the machine.
•
Side load material opposite the cable carrier only! Utilize the back of the machine to park the gantry while loading
material.
•
A dedicated earth ground must be provided and should be installed in a manner to reduce trip hazard.
113.25”
167”
Load From
This Side
Operator
Console
MAINTAIN WORK AREA
5100
FlexCut
Plasma
(within 10’ of cable
carrier)
15’ Power Cord, NEMA 5-15P
Shop Air Supply
Earth Ground
(provided by customer)
Incoming AC power
for Plasma Cutter
Shop air supply
14” Duct, Downdraft
Models Only