(1) Pumping down
•
Procedure
1. Confirm that both the gas side and liquid side
valves are set to the open position.
- Remove the valve stem caps and confirm that
the valve stems are in the raised position.
- Be sure to use a hexagonal wrench to operate
the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then con-
nect the manifold gauge to the service port of
the gas side valve.
- Connect the hose of the gauge with the push
pin to the service port.
4. Air purging of the charge hose.
- Open the Low-handle valve on the gauge
slightly to air purge from the hose.
5. Set the liquid side valve to the closed position.
6. Operate the air conditioner at the cooling cycle
and stop it when the gauge indicates 1kg/cm
2
g.
7. Immediately set the gas side valve to the closed
position.
- Do this quickly so that the gauge ends up indi-
cating 1kg/cm
2
g.
8. Disconnect the charge set, and mount the liquid
side and gas side valve caps and the service
port nut.
- Use torque wrench to tighten the service port
nut to a torque of 1.8kg.m.(4.2kg.m/5.5kg.m)
- Be sure to check for gas leakage.
9. Apply steps from 1 to 8 to each unit (A, B, C, D,
E, F-unit) by the same method.
- 77 -
Indoor unit
Outdoor unit
Liquid side
Close
Gas side
3-Way
valve
Open
3-Way
valve
manifold gauge
Vacuum pump
Hi- handle
(CLOSE)
Low-
handle
(OPEN)
Summary of Contents for FMN0760NL
Page 94: ... 94 FMN1260NT FMN1860NT ...
Page 95: ... 95 FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 96: ... 96 FMN1860NV ...
Page 97: ... 97 2 Outdoor Unit MAIN P C B ASM FMU4480N6L ...
Page 98: ... 98 PCB PWB ASSY SUB ...
Page 99: ... 99 3 Display ASSY FMN1860NV FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 100: ... 100 4 SUB P W B ASSEMBLY FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 101: ... 101 Schematic Diagram 1 Indoor Unit FMN0760NL FMN0960NL FMN1260NL FMN1860NL ...
Page 103: ... 103 FMN1260NFM B D ...
Page 104: ... 104 FMN1860NV RY 4WAY RY OUTFAN ...
Page 122: ...P No 3828A20208A August 2002 Printed in Korea ...