- 34 -
1. Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in hard-
ening the pipe.)
2. After deforming the piping, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
3. Connect pipe to the service valve or ball valve
which is located below the outdoor unit.
4. After completing the piping connection, be sure
to check if there is gas leakage in indoor and
outdoor connection.
After completing the piping connection, execute
vacuum drying for the connecting piping and the
indoor unit.
The vacuum drying must be carried out using the
service ports of both the liquid and gas side valves.
Use two wrenches and tighten with regular torque.
Outdoor
unit
Liquid side
Flare connection
Flare connection
Gas side
Indoor
unit
Union
Piping Connection
Vacuum drying
CAUTION
Flare nut fastening torque
Ø6.35mm(1/4")
1.8kg.mm
Ø9.52mm(3/8")
4.0kg.mm
Ø12.7mm(1/2")
5.5kg.mm
Ø15.88mm(5/8")
6.6kg.mm
Summary of Contents for FMN0760NL
Page 94: ... 94 FMN1260NT FMN1860NT ...
Page 95: ... 95 FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 96: ... 96 FMN1860NV ...
Page 97: ... 97 2 Outdoor Unit MAIN P C B ASM FMU4480N6L ...
Page 98: ... 98 PCB PWB ASSY SUB ...
Page 99: ... 99 3 Display ASSY FMN1860NV FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 100: ... 100 4 SUB P W B ASSEMBLY FMN1260NFM B D TOP VIEW BOTTOM VIEW ...
Page 101: ... 101 Schematic Diagram 1 Indoor Unit FMN0760NL FMN0960NL FMN1260NL FMN1860NL ...
Page 103: ... 103 FMN1260NFM B D ...
Page 104: ... 104 FMN1860NV RY 4WAY RY OUTFAN ...
Page 122: ...P No 3828A20208A August 2002 Printed in Korea ...