evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • [email protected]
1-1
Before installing stations
The charging station is divided in to
3
Sections:
1.) Mounting Assembly which installs first
2.) Cable Assembly which installs second
3.) Head Unit which installs third and last
Please see the Level 2 only Public Use Charging Station Product Bulletin for part number and
dimensional details. To download the bulletin, go to www.leviton.com/evrgreen.
Bollard Mount stations require 3 part numbers, each in a separate box.
Pole or Wall Mount stations require 4 part numbers, each in a separate box.
Detailed mounting instructions are provided for each mounting method:
See Chapter 2 for Bollard Mounting
See Chapter 3 for Pole Mounting
See Chapter 4 for Wall Mounting
Cable Assembly and Head Unit Installation is the same for all mounting methods.
See Chapter 5 for Cable Assembly Installation
See Chapter 6 for Head Unit Installation
The instructions provided in this guide assume that the appropriate wiring, circuit protection, and
metering is in place at the installation location. Before you install, you must also ensure that the type of
modem in each station you are installing is compatible with the type of modem coverage available at the
installation site (CDMA or GPrS for US installations. GPrS only for Canadian installations.)
To assist in the process of preparing the installation site, thoroughly review the following documents:
• Wiring diagrams (provided in Chapter 1: Introduction page 1-3 of this manual.)
• Evr-Green Level 2 Public Use Charging Station Product Bulletin (available for download from
www.leviton.com/evrgreen).
• Leviton Provisioning Worksheet and Instructions for Leviton Provisioning Portal.
• Mounting Templates for Bollard Mount and Wall Mount stations. The Bollard Mount template is
located in Chapter 2, page 2-5. The Wall Mount template is located in Chapter 4, page 4-3.
IMPORTANT:
If you are printing the PDF version of the Mounting Template, be sure to print at
full scale using 11” x 17” paper.
Note: If you are installing a Bollard Mount charging station, prepare the site according to the
instructions provided in Chapter 2 “Step 4 - Install J-Bolts and conduit” on page 2-5 of this document.
It is also recommended that before you begin installing charging stations, you thoroughly review the
contents of this document to familiarize yourself with the required installation steps.
1
Introduction
Before Installing Stations