www.leviton.com/evrgreen • 1-877-338-7473 • [email protected]
evr-green
™
Level
2 -
Network Charging Station For Public Applications
Step 5 - Mount body to bracket
Insert the coupler into the hole and
hold the body assembly to the pole
bracket using the four supplied screws
and washers.
Use
these
holes
3-6