evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • [email protected]
Step 2 - Drill hole in pole
Drill a 1 ½“ (38 mm) hole in the pole to
accommodate the 1 ¼” (32 mm) OD
coupling.
The maximum height above the surface
must be 30” (76 cm) to comply with the
Americans with Disabilities Act (ADA).
30” (76 cm)
maximum
height
3-3