Figure 142. Installing the door
Align the door with the hinges, and hold the door in place.
Push the hinge pins down to the closed position so that the door is secured.
Installing and removing power distribution units or switches
See this topic to learn how to remove and install power distribution units or switches.
Install and remove a 0U PDU
See this topic to learn how to install and remove a 0U PDU.
Install a 0U PDU
Procedure
Step 1. Insert the two PDU pegs into the keyhole slots in the side of the rack cabinet, and push down the
PDU to secure it to the rack.
.
Hardware removal, installation and reversion
125
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......