
Step 7. Remove the four screws that secure the cable access bar, and remove the bar.
Figure 54. Removing the cable access bar
Step 8. Align the lower air baffle to the bottom cable slot, and secure it with four screws as illustrated.
Figure 55. Installing the lower air baffle
Step 9. Secure the bottom hinge assembly to the rack cabinet with eight screws.
.
47
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......