Figure 42. Installing the rack grounding kit
Step 2. Remove the side cover.
Figure 43. Removing a side cover
Unlock the side cover with the key.
Press on the two latches on both sides of the cover to disengage it from the rack.
Rotate the top of the side cover away from the rack, and remove it.
Step 3. Align the bottom of the side cover with the slot on the rack cabinet; then, connect the grounding
jumper wire to the posts on the rack frame and the side cover.
.
37
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......