Figure 147. Installing a 1U PDU or console switch
Install four M6 clip nuts on the rack flanges as shown in the illustration.
Slide the device all the way into the side pocket.
Secure the device with four M6 screws.
Step 4. Complete all the required cable connection and setup of the device. Refer to the document that
comes with the device for details.
• Make sure to complete all the required cable connection and device setup before installing
baying kits to the cabinets, as these tasks will be hard to operate afterwards.
• It is advised to complete all the cable connection and setup task for the device before installing
the side cover back.
Step 5. Install the side cover back (see “Install a side cover” on page 82).
Remove a 1U device from the side pocket
Procedure
Step 1. Remove the device.
132
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......