![Lenovo ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Manual Download Page 24](http://html.mh-extra.com/html/lenovo/thinksystem-heavy-duty-full-depth-42u-rack-cabinet/thinksystem-heavy-duty-full-depth-42u-rack-cabinet_user-manual_200499024.webp)
Step 8. Secure the ramp with one of the bolts that are removed from the shipping brackets.
Figure 20. Securing the ramp
Step 9. Place the ramp next to the cabinet front door, and slowly slide the rack cabinet down from the
pallet to the designated location.
Figure 21. Moving the cabinet
Install the baying kit
More than one rack cabinets could be connected into a suite. See this topic to learn how to attach rack
cabinets into a suite with the baying kit.
About this task
20
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide
Summary of Contents for ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Page 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Page 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Page 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Page 153: ......
Page 154: ......