3. Note the orientation of the hot-swap redundant power supply module and then slide the new hot-swap
redundant power supply module into the chassis until it snaps into position.
Note:
If your server comes with one hot-swap redundant power supply module installed in the
redundant power supply module bay 1 (the bay number is marked on the rear of the chassis) and you
are installing a secondary hot-swap redundant power supply module to provide redundant power, you
need to remove the shield that protects the bay 2 first. Save the shield for future use.
Figure 81. Installing a hot-swap redundant power supply module
4. If you are instructed to return the old hot-swap redundant power supply module, follow all packaging
instructions and use any packaging materials that are supplied to you for shipping.
5. To work with another piece of hardware, go to the appropriate section.
Replacing the power distribution board and cage assembly
Attention:
Do not open your server or attempt any repair before reading and understanding the “Safety information”
on page iii and “Guidelines” on page 83.
This topic provides instructions on how to replace the power distribution board and cage assembly.
This topic applies only to server models that come with hot-swap redundant power supply modules.
CAUTION:
Hazardous moving parts. Keep fingers and other body parts away.
Chapter 6
.
Installing, removing, or replacing hardware
143
Summary of Contents for ThinkServer
Page 1: ...ThinkServer User Guide Machine Types 0387 0388 0389 0390 0391 0392 0393 and 0441 ...
Page 16: ...4 ThinkServer User Guide ...
Page 18: ...6 ThinkServer User Guide ...
Page 64: ...52 ThinkServer User Guide ...
Page 178: ...166 ThinkServer User Guide ...
Page 186: ...174 ThinkServer User Guide ...
Page 190: ...178 ThinkServer User Guide ...
Page 208: ...196 ThinkServer User Guide ...
Page 209: ......
Page 210: ......