background image

Step 3.  On the PDU Configuration Utility main menu, type 

to select 

Set PDU Location and Outlet 

Information

Step 4.  Ttype the 

GlobalDelayTimer 

value. 

34

1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide

Summary of Contents for 46M4002

Page 1: ...1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 2: ...enses information on the Lenovo Web site at https support lenovo com documents LNVO DOCS Second Edition October 2018 Copyright Lenovo 2015 2018 LIMITED AND RESTRICTED RIGHTS NOTICE If data or software is delivered pursuant to a General Services Administration GSA contract use reproduction or disclosure is subject to restrictions set forth in Contract No GS 35F 05925 ...

Page 3: ...figuration 46 Event and history log summaries 46 Chapter 6 Using the PDU environment sensor 49 Features 49 Connecting the PDU environment sensor to the PDU 49 Chapter 7 Customer replaceable unit parts 53 Chapter 8 PDU specifications 55 Appendix A Default PDU settings 59 Appendix B Behavior of the PDU reset button 61 Appendix C Getting help and technical assistance 63 Before you call 63 Using the d...

Page 4: ...Taiwan Class A compliance statement 73 Taiwan BSMI RoHS declaration 74 Index 75 ii 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 5: ...erer dette produkt Lees voordat u dit product installeert eerst de veiligheidsvoorschriften Ennen kuin asennat tämän tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lisez les consignes de sécurité Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installare questo prodotto leggere le Informazioni sulla Sicurezza ...

Page 6: ... number is used to cross reference an English language caution or danger statement with translated versions of the caution or danger statement in the Safety Information document For example if a caution statement is labeled Statement 1 translations for that caution statement are in the Safety Information document under Statement 1 Be sure to read all caution and danger statements in this documenta...

Page 7: ...n the installation and configuration procedures Connect and disconnect cables as described in the following table when installing moving or opening covers on this product or attached devices Table for Safety Statement 1 that explains the steps to connect and disconnect cables To Connect To Disconnect 1 Turn everything OFF 2 First attach all cables to devices 3 Attach signal cables to connectors 4 ...

Page 8: ...Statement 14 CAUTION Hazardous voltage current and energy levels might be present Only a qualified service technician is authorized to remove the covers where the following label is attached ...

Page 9: ...ts From a central location Active Energy Manager can power off or power on the outlets This enables an administrator to prevent someone from connecting additional equipment into unused outlets thereby making it easier to control power consumption within a rack Active Energy Manager can also shut down outlets in an emergency situation If firmware and documentation updates are available you can down...

Page 10: ...net For vertical mounting instructions of the 1U PDU see Chapter 2 Installing the 1U PDU vertically in a rack cabinet on page 9 For horizontal mounting instructions of the 1U PDU see Chapter 3 Installing the 1U PDU horizontally in a rack cabinet on page 17 Inventory checklist Note The illustrations in this document might differ slightly from your hardware Parts that come with all PDU models The fo...

Page 11: ...that come with the 1U PDU models The following parts come with the 1U PDU models One of the following PDU models some models come with an attached power cord Two vertical mounting brackets for all rack cabinets Two short mounting brackets for horizontal mounting in all rack cabinets for vertical mounting only in Enterprise rack cabinets Chapter 1 Introduction 3 ...

Page 12: ...fic IP security masks to prevent unauthorized access Remote monitoring of connected devices and sensors Monitoring of the PDU locally remotely through IBM Systems Director Active Energy Manager or remotely through a console or network Comprehensive power management and flexible configuration through a web browser NMS Telnet SNMP or HyperTerminal console Configurable user security control Daily his...

Page 13: ...t sensor connector Environment sensor connector You can connect a PDU environment sensor to this connector The PDU environment sensor monitors humidity and temperature The connection of a PDU environment sensor is automatically detected LED The green LED shows the PDU input voltage status When this LED is lit the PDU is receiving voltage If the input voltage is too low this LED is flashing Circuit...

Page 14: ...nsmitted and received RS 232 connector Connect a DB9 to RJ 45 cable to this connector and to the serial COM connector on a workstation or notebook computer and use the workstation or notebook computer as a configuration console Green LED on the left in a horizontal orientation on the top in a vertical orientation This LED is lit when the power to the PDU is turned on This LED flashes 500 ms on 500...

Page 15: ...eaker specifications and how the PDU outlets are connected If loads are greater than the specification of the circuit breaker it will trip and turn off the load There are either six or nine circuit breakers on the front of the PDU depending on the model Each circuit breaker is rated for 20 amps When you connect loads make sure that the rating for each circuit breaker is not exceeded Some PDUs can ...

Page 16: ...p 1 Phase 2 outlet group 2 Phase 3 outlet group 3 Some models have 3 outlets on the rear of the PDU These outlets are not monitored or switched Each outlet is connected to a different phase To balance loads on the PDU do not connect loads so that there is more load on one group of outlets than others For example if there are three loads on a 9 outlet PDU do not use outlets 1 2 or 3 use outlets 1 4...

Page 17: ...ystems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures Connect and disconnect cables as described in the following table when installing moving or opening covers on this product or attached devices To Connect To Disconnect 1 Turn everything OFF 2 First attach all cables to devices 3 Attach signal cables to connector...

Page 18: ... cabinet To install a PDU in the side of a rack cabinet by using the vertical mounting brackets complete the following steps 1 Align the vertical mounting brackets to the front of the PDU and attach the brackets to the PDU with two M3 x 5 screws per bracket Use the screws that come with the PDU You can install the PDU in a rack cabinet with the power outlets facing the rear or the front of the rac...

Page 19: ...ation Attention You must disconnect the main input power before you connect or disconnect the input power cord from the PDU 3 If the PDU comes with a detached power cord connect the power cord Align the connector on the power cord that comes with the PDU with the connector on the front of the PDU turning as necessary for key alignment then turn the twist lock on the connector clockwise until it lo...

Page 20: ...ide of an Enterprise rack cabinet only Note Removing the rack doors and side panels might make installation easier See the rack cabinet documentation for more information Review the documentation that comes with your rack cabinet for safety and cabling information When you install the PDU in a rack cabinet observe the following precautions Make sure that the room air temperature is below 35 C 95 F...

Page 21: ...the rear of the rack cabinet 5 6 2 1 3 4 LAN Short mounting bracket 2 Attach the brackets to the PDU with two M3 x 5 screws per bracket Use the screws that come with the PDU 3 Align the PDU with the opening in the side of the rack cabinet then while you hold the PDU in place attach the brackets to the rack mounting flanges with four clip nuts and four M6 screws that come with the PDU Chapter 2 Ins...

Page 22: ...ched power cord connect the power cord Align the connector on the power cord that comes with the PDU with the connector on the front of the PDU turning as necessary for key alignment then turn the twist lock on the connector clockwise until it locks into place Key alignment Twist lock 14 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 23: ...ided cable straps to secure the power cord along the way If the power cord must exit the rack cabinet to connect to a power source use the openings in the rack cabinet 7 Connect the power cord to a properly wired and grounded dedicated power source Then you can connect servers or rack PDUs in the rack cabinet to the power outlets on the PDU 8 Route all the other power cords neatly and secure the p...

Page 24: ...16 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 25: ...e that the room air temperature is below 35 C 95 F Do not block any air vents usually 15 cm 6 in of air space provides proper airflow Plan the device installation starting from the bottom of the rack cabinet Install the heaviest device in the bottom of the rack cabinet Do not extend more than one device out of the rack cabinet at the same time Connect all power cords to properly wired and grounded...

Page 26: ...rocedures Connect and disconnect cables as described in the following table when installing moving or opening covers on this product or attached devices To Connect To Disconnect 1 Turn everything OFF 2 First attach all cables to devices 3 Attach signal cables to connectors 4 Attach power cords to outlet 5 Turn device ON 1 Turn everything OFF 2 First remove power cords from outlet 3 Remove signal c...

Page 27: ...ails 4 Orient the PDU so that the vent holes are facing up Hold the PDU at a slight angle and carefully insert it into the 1U mounting space in the rack cabinet Pushing in slightly on both of the adjustable mounting rails helps clear the rails from the rack flanges 5 Secure the end of the PDU that has the short mounting brackets to the rack cabinet first Make sure that the short mounting brackets ...

Page 28: ...he outside of the rack flanges e Attach the filler panel to the adjustable mounting rail and then to the rack flanges and then to the rack cabinet Use one M6 screw per mounting rail f Tighten the M3 pan head screws that secure the adjustable mounting rails to the PDU 7 If the PDU comes with a detached power cord connect the power cord Align the connector on the power cord that comes with the PDU w...

Page 29: ...se the provided cable straps to secure the power cord along the way If the power cord must exit the rack cabinet to connect to a power source use the openings in the rack cabinet 10 Connect the power cord to a properly wired and grounded dedicated power source Then you can connect servers or rack PDUs in the rack cabinet to the power outlets on the PDU 11 Route all the other power cords neatly and...

Page 30: ...22 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 31: ...nverter cable to connect the PDU to a workstation or notebook computer To connect the PDU to a workstation or notebook computer using a DB9 to USB converter cable complete the following steps 1 Obtain a DB 9 to USB converter cable must be purchased separately 2 On the workstation or notebook computer that you are connecting to the PDU install the device drivers for the DB 9 to USB converter cable ...

Page 32: ...n or notebook computer that is connected to the same network For more information about how to monitor the PDU and its output devices through the web see Using the web interface on page 39 The following illustration shows how to connect a router or switch to a 1U PDU 5 6 2 1 3 4 LA N Ethernet cable Ethernet connector Router PDU Connecting to a PDU environment sensor The PDU environment sensor that...

Page 33: ... 49 Connecting output devices The PDU power outlets are for connecting devices such as workstations servers and printers You can monitor the power status of a connected device either manually or remotely through the RS 232 and Ethernet connectors Connect a device that you want to monitor to a power outlet on the PDU with the power cord that comes with the device Chapter 4 Cabling the PDU 25 ...

Page 34: ...26 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 35: ...se the web interface to monitor the PDU power status you must use the PDU Configuration Utility to set up the PDU To configure the PDU by using the PDU Configuration Utility complete the following steps Step 1 Connect a workstation or notebook computer to the PDU Connect one end of a DB9 to RJ 45 cable to the RS 232 connector on the PDU and the other end to an RS 232 serial COM connector on a work...

Page 36: ...K Step 5 When a blank window opens press Enter The PDU Configuration Utility login window opens Step 6 Type the default login ID ADMIN and the password 1001 Press Enter The PDU Configuration Utility main menu window opens 28 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 37: ...rk parameters The Setup Network Information window opens Step 8 To enable or disable DHCP press either 1 or 2 as applicable The default is Disable Then type the IP address gateway IP address and subnet mask Press Enter Chapter 5 Monitoring the power status 29 ...

Page 38: ...displayed Step 10 Press any key to return to the main menu You can continue to use the PDU Configuration Utility or you can use the web interface to configure and monitor the PDU remotely For more information see Using the web interface on page 39 30 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 39: ...ent might be a problem in some applications if you are powering on multiple devices at the same time In such applications the power on sequence function is required to power on devices in user definable sequences to limit in rush current The PDU outlet numbering is shown in the following illustration The PDU orientation is horizontal with the Ethernet port on the left 5 6 2 1 3 4 LAN 2 1 3 4 6 5 7...

Page 40: ...mer value The outlets that were off before the PDU was turned off or lost power will stay off after power is restored The outlets that were on before the PDU was turned off or lost power will be tuned back on in a sequence that is determined by the timers If the timer values are zero the only delay is the PDU boot up time which is 10 seconds If there are values in the delay timers the turn on time...

Page 41: ...ime GlobalDelayTimer IndividualDelayTimer 8 16th second Total Delay time bootup time GlobalDelayTimer IndividualDelayTimer 9 17th second Total Delay time bootup time GlobalDelayTimer IndividualDelayTimer 10 Off Previous state is Off 11 20th second Total Delay time bootup time GlobalDelayTimer IndividualDelayTimer 12 Off Previous state is Off The following sections explain how to configure the Glob...

Page 42: ... PDU Configuration Utility main menu type 8 to select Set PDU Location and Outlet Information Step 4 Ttype the GlobalDelayTimer value 34 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 43: ... for each outlet Using Telnet through the Ethernet port To set the parameters for the power on sequence function by using an Ethernet port and the Telnet interface complete the following steps Step 1 Log in as ADMIN 1001 Chapter 5 Monitoring the power status 35 ...

Page 44: ... System Configuration Step 3 Type 3 for Outlet Global Delay Timer and PDU Location Step 4 Type 15 to define the Outlet Global Delay Timer 36 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 45: ...ep 5 Type the value for the New Outlet Global Delay Timer Step 6 Type 0 to return to the previous menu Step 7 Type 4 for the Outlet Name and Individual Delay Timer Chapter 5 Monitoring the power status 37 ...

Page 46: ...ualDelayTimer value Using SNMP through the Ethernet port To set the parameters for the power on sequence function by using an Ethernet port and the SNMP interface complete the following steps 38 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 47: ...r parameter with the OID Using the web interface This section provides information about using the web interface to configure and monitor the PDU remotely The PDU provides a graphical user interface that you can view from a web browser Using a web browser you can access and monitor the PDU power outlets and output devices remotely from a workstation or notebook computer Chapter 5 Monitoring the po...

Page 48: ...DU power outlets and input status per load segment The left pane shows the menus and submenus for the PDU Click a menu to display the menu choices expand the menu items and modify the menu choices as required The information in the right pane shows the status of the voltage real power amperes apparent power power factor and energy Each menu page provides online help to assist you with configuring ...

Page 49: ...sensor is connected to the PDU you can view the temperature and humidity information For more information about installing and using the PDU environment sensor see Chapter 6 Using the PDU environment sensor on page 49 Viewing the status On the Status of Environment Sensor page you can view the temperature and humidity status from the PDU environment sensor Changing the environment configuration se...

Page 50: ...On the Configuration of PDU page you can change the system name and location SNMP community and history log interval and you can restart the PDU Displaying SNMPv3 information On the SNMPv3 USM Setup page you can set up the configuration for user profiles of SNMPv3 USM related parameters You can set up the user authentication method and privacy method 42 1U C19 and C13 Switched and Monitored PDUs I...

Page 51: ...fy the information on the Identification of Power Management page Changing the date and time On the Date and Time page you can change the date and time of the PDU You can set the date and time manually or synchronize it with the computer time Note Changing the PDU date and time affects other PDU settings such as e mail traps and logs Chapter 5 Monitoring the power status 43 ...

Page 52: ...Receivers page you can specify the IP address of a server on which a monitoring application is running Upgrading firmware You can upgrade the PDU firmware on the Upgrade Firmware page To update the firmware type the TFTP server IP address and the firmware image file name and click Upgrade 44 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 53: ...nction updates the EEPROM of the PDU Export configuration On the Export Configuration page you can export the configuration settings of the PDU to a file Then you can import the exported file to other like PDUs in the network to provide consistent and similar configuration settings Chapter 5 Monitoring the power status 45 ...

Page 54: ...mail Event and history log summaries The Logs menu provides a detailed description of all events and a record of the PDU status System administrators can use this page to analyze problems with network equipment Viewing the event log On the Event Log page you can view the complete record of the PDU events Each event log file shows the date time and description of each event that has occurred on the...

Page 55: ...og page you can access the complete history of the PDU inputs outputs and PDU environment sensor On the page you can clear the history log or export the history log to a comma separated values CSV file Chapter 5 Monitoring the power status 47 ...

Page 56: ...48 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 57: ...hout turning off power to the PDU or to the loads that are connected to it It monitors temperature and humidity information of any environment that you want to protect your critical equipment It measures temperatures between 0 C and 80 C 32 C and 176 F with an accuracy of 1 C It measures relative humidity between 10 and 90 with an accuracy of 5 It can be located away from the PDU with a Category 5...

Page 58: ...h the environment sensor to the PDU environment sensor and to the environment sensor connector on the PDU Note If the cable is not long enough for your configuration you can use a cable that is 20 m 65 6 ft or shorter The following illustration shows how to connect an Ethernet cable to a 1U PDU and to the PDU environment sensor 5 6 2 1 3 4 LA N Ethernet cable Environment sensor connector PDU PDU e...

Page 59: ...splayed 5 Click Environment and then click Configuration The Configuration of Environment Sensor page opens You can set the upper and lower ranges of temperature and humidity that will generate SNMP traps and e mail notification if the PDU is configured to do so Chapter 6 Using the PDU environment sensor 51 ...

Page 60: ...52 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 61: ...nce on page 63 The PDU does not contain any serviceable parts PDU description Option part number Tier 1 CRU part number 1U 9 C19 3 C13 Switched and Monitored DPI PDU with removable power cord 46M4002 46M4014 1U 9 C19 3 C13 Switched and Monitored 60 A three phase PDU with attached power cord 46M4003 46M4015 1U 12 C13 Switched and Monitored DPI PDU with removable power cord 46M4004 46M4016 1U 12 C13...

Page 62: ...54 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 63: ...0P 2P Gnd connector 46M4002 40K9614 5 DPI 30 amp 208 V single phase 1U 12 C13 switched and monitored DPI PDU with NEMA L6 30P 2P Gnd connector 46M4004 40K9614 6 DPI 60 amp 208 V three phase 1U 9 C19 3 C13 switched and monitored PDU with IEC 309 3P Gnd connector 46M4003 with attached power cord 6 DPI 60 amp 208 V three phase 1U 12 C13 switched and monitored PDU with IEC 309 3P Gnd connector 46M4005...

Page 64: ...ase 12 200 208 V ac 24 amps single phase 13 220 240 V ac 30 amps single phase Maximum power rating 1 7680 VA 2 9984 VA 3 15120 VA 4 23040 VA 5 4992 VA 6 17292 VA 7 9984 VA 8 15120 VA 9 23040 VA 10 17292 VA 11 7680 VA 12 4992 VA 13 7200 VA Rated frequency50 60 Hz Circuit breakers Nine double pole branch rated circuit breakers rated at 20 amps for 1U C19 PDU modelsSix double pole branch rated circui...

Page 65: ... L G 32 amps 250 V ac IEC 309 P N Gnd DPI 63 amp 250 V single phase Enterprise C19 C13 PDU or PDU with IEC 309 P N Gnd connector N L G N L G 63 amps 250 V ac IEC 309 P N Gnd DPI 30 amp 208 V single phase Enterprise C19 C13 PDU or PDU with NEMA L6 30P 2P Gnd connector G X Y G X Y 30 amps 250 V ac NEMA L6 30P 2P Gnd DPI 60 amp 208 V single phase Enterprise C19 C13 PDU or PDU with IEC 309 2P Gnd conn...

Page 66: ...mp 250 V single phase Enterprise C19 C13 PDU or PDU P N Gnd PDL P N 56P332 Australia New Zealand connector L N G N L G 32 amps 250 V acP N 56S0332P N Gnd DPI 30 amp 250 V single phase Enterprise C19 C13 PDU or PDU P N Gnd Shin Ju P N SJ P3302 Korea connector L 30A 250V N G L N G 30 amps 250 V acP N Gnd 58 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 67: ...d C13 Switched and Monitored PDU is 192 168 1 254 with a subnet mask of 255 255 255 0 The default PDU administrator logon user name is ADMIN in capitals and the default password is 1001 They are also referred to as default user account credentials Copyright Lenovo 2015 2018 59 ...

Page 68: ...60 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 69: ... different functions Press and hold the reset button for two to five seconds reset the PDU to the default user account credentials See Appendix A Default PDU settings on page 59 Press and hold the reset button for more than eight seconds restart the system Copyright Lenovo 2015 2018 61 ...

Page 70: ...62 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 71: ... have installed new hardware or software in your environment check http www lenovo com serverproven to make sure that the hardware and software is supported by your product Go to http www lenovo com support to check for information to help you solve the problem Gather the following information to provide to the service technician This data will help the service technician quickly provide a solutio...

Page 72: ... The most current version of the product documentation is available in the following product specific Information Centers Flex System products http pic dhe ibm com infocenter flexsys information index jsp System x products http publib boulder ibm com infocenter systemx documentation index jsp NeXtScale System products http pic dhe ibm com infocenter nxtscale documentation index jsp How to send DSA...

Page 73: ...Canada call 1 800 IBM SERV 1 800 426 7378 Hardware service and support IBM is Lenovo s preferred service provider for the System x Flex System and NeXtScale System products You can receive hardware service through your Lenovo reseller or from IBM To locate a reseller authorized by Lenovo to provide warranty service go to http www ibm com partnerworld and click Business Partner Locator For IBM supp...

Page 74: ...66 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 75: ...publication Lenovo may make improvements and or changes in the product s and or the program s described in this publication at any time without notice The products described in this document are not intended for use in implantation or other life support applications where malfunction may result in injury or death to persons The information contained in this document does not affect or change Lenov...

Page 76: ...drive bays with the largest currently supported drives that are available from Lenovo Maximum memory might require replacement of the standard memory with an optional memory module Each solid state memory cell has an intrinsic finite number of write cycles that the cell can incur Therefore a solid state device has a maximum number of write cycles that it can be subjected to expressed as total byte...

Page 77: ...nant Limits Particulate The room air must be continuously filtered with 40 atmospheric dust spot efficiency MERV 9 according to ASHRAE Standard 52 21 Air that enters a data center must be filtered to 99 97 efficiency or greater using high efficiency particulate air HEPA filters that meet MIL STD 282 The deliquescent relative humidity of the particulate contamination must be more than 60 2 The room...

Page 78: ... apparatus complies with Canadian ICES 003 Avis de conformité à la réglementation d Industrie Canada Cet appareil numérique de la classe A est conforme à la norme NMB 003 du Canada Australia and New Zealand Class A statement Attention This is a Class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures Europe...

Page 79: ... vom 20 Juli 2007 früher Gesetz über die elektromagnetische Verträglichkeit von Geräten bzw der EMV EU Richtlinie 2014 30 EU für Geräte der Klasse A Dieses Gerät ist berechtigt in Übereinstimmung mit dem Deutschen EMVG das EG Konformitätszeichen CE zu führen Verantwortlich für die Konformitätserklärung nach Paragraf 5 des EMVG ist die Lenovo Deutschland GmbH Meitnerstr 9 D 70563 Stuttgart Informat...

Page 80: ... Equal to 20A per phase JEITA harmonics guideline Japanese Statement of Compliance for Products More than 20A Korea Communications Commission KCC statement This is electromagnetic wave compatibility equipment for business Type A Sellers and users need to pay attention to it This is for any areas other than home Russia Electromagnetic Interference EMI Class A statement 72 1U C19 and C13 Switched an...

Page 81: ...People s Republic of China Class A electronic emission statement Taiwan Class A compliance statement Appendix D Notices 73 ...

Page 82: ...Taiwan BSMI RoHS declaration 74 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...

Page 83: ...s A notice 70 features of PDU 4 G gaseous contamination 69 Germany Class A statement 70 green LED 5 H hardware service and support telephone numbers 65 help from the World Wide Web 64 from World Wide Web 64 sending diagnostic data 64 sources of 63 horizontal mounting in rack cabinet 18 HyperTerminal using for power on sequencing 33 I important notices 1 68 information center 64 input power connect...

Page 84: ...ement 72 S sending diagnostic data 64 service and support before you call 63 hardware 65 software 65 setting PDU IP address using web interface 46 SNMP using for power on sequencing 38 software service and support telephone numbers 65 specifications PDU 55 statements and notices 1 support web page custom 64 T Taiwan BSMI RoHS declaration 74 Taiwan Class A electronic emission statement 73 Taiwan pr...

Page 85: ......

Page 86: ......

Reviews: