This unit must be installed by a qualified 

competent person

in compliance with current requirements for 

Electrical Installations (IEE Wiring regulations Seventeenth Edition: 

BS7671

).

!

Ensure that all power supplying this equipment is switched OFF before working on or inside the unit.

!

Confirm the power is off with an appropriately rated volt-sensing device.

!

Make sure all devices, covers and doors are replaced and secured before switching the power supply back on to the unit.

!

Remove the gland plates prior to slotting or cutting for cable entries to avoid ingress of swarf & other debris.

!

The user guide must be available for future reference after installation and testing.

Failure to follow these instructions could result in 

serious injury or death

Models Available:

TPNEB Empty Expansion Box 
TPNA16W 16 Way Type A Modular Service Box

TPNMM Multi-Function Meter Box

All  models can be mounted to the top or the bottom of a TPN distribution board although as standard the TPNMM and the

TPNEB come ready to mount to the underside and the TPNA16W to the top of the TPN distribution board. 

20

0

465

13

5

Dimensions

You Will Need:

n

Pozidrive PZ2

n

Long Reach Pozidrive

n

Hammer

n

Adjustable Screwdriver

n

Hole Punch/Jigsaw

20

0

465

13

5

Extension box instructions for 3PB _Layout 2  20/12/2013  14:10  Page 1

Summary of Contents for TPN Series

Page 1: ... gland plates prior to slotting or cutting for cable entries to avoid ingress of swarf other debris The user guide must be available for future reference after installation and testing Failure to follow these instructions could result in serious injury or death ModelsAvailable TPNEB Empty Expansion Box TPNA16W 16 Way TypeAModular Service Box TPNMM Multi Function Meter Box All models can be mounted...

Page 2: ...NMM Additional Instructions For The Meter Panel TPNMM n When removing the lid take care to remove the cable plugs from the rear of the meter ensuring that a note is made of which way they are needed to be when re assembling Safely store the front panel in a safe place taking care not damage the front of the meter Remove the earth strap from the case and remove the assembled back plate so that the ...

Page 3: ... should the meter need to be re programmed in order to add other features then the following process should be followed Before a setting can be changed the meter has to be entered into programme mode Display Meaning Display Meaning CodE Code pur Code Input chAG Change Code sEr Set clt E Energy Clearance diSP Display Sn Instrument Address In Pr Signal Input Conn Communication n 8 1 Data Bite 8 Stop...

Page 4: ...work Setting Up Arrow Up Arrow CodE SEr In Pr Set In Pr nEr Set In Pr nEr n3 4 n3 3 3 Wire 3 Phase n3 4 3 Wire 4 Phase Factory setting Or 3 3 Via the up arrow Press return twice In Pr Pr 0000 In Pr Cr 0000 In Pr Pr 0000 In Pr Cr 0030 Up Arrow Up Arrow CodE SEr In Pr Up Arrow Conn Set Conn Sn Set Conn Sn 0001 Number of meters 0001 Up Arrow Conn bAUd Set Conn bAUd 9600 Up Arrow Conn bAUd 4800 Up Arr...

Page 5: ...S1079 001 Technical Data Wiring Schematic TPNMM 00 0 1 2 34 35 36 0 1 2 345 60 0 789 9 A B C 9 D5 E FA B A 0 BE G B C 9 H I J K 2 1 I J K 2 1 00 0 2 1 34 35 36 TPNMM Wiring Schematic _Layout 1 23 12 2013 10 53 Page 1 ...

Reviews: