GUIDE SPECIFICATIONS
TP − 3 to 5 Ton High−Efficiency, R−410A Heat Pump
/ Page 20
PART 1.05
QUALITY ASSURANCE
A.
Qualifications:
1.
Installer experienced in performing work of this section who has specialized in installation of work similar to that
required for this project.
2.
Manufacturer Qualifications: Manufacturer capable of providing field service representation during construction and
approving application method.
B.
Preinstallation Meetings: Conduct preinstallation meeting to verify project requirements, manufacturer’s installation
instructions and manufacturer’s warranty requirements. Comply with Division 01 Project Management and Coordination
(Project Meetings).
PART 1.06
DELIVERY, STORAGE & HANDLING
A.
General: Comply with Section
[01 61 00 − Common Product Requirements] [______]
.
B.
Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to avoid construction delays.
C.
Packing, Shipping, Handling and Delivery:
1.
Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.
2.
Ship, handle and unload units according to manufacturer’s instructions.
D.
Storage and Protection:
1.
Store materials protected from exposure to harmful weather conditions.
2.
Factory shipping covers to remain in place until installation.
Specifier Note: Include or remove following section as project dictates.
E.
Waste Management and Disposal:
Specifier Note: ENVIRONMENT: The disposal of packaging waste into landfill site demonstrates an inefficient use of natural
resources and consumes valuable landfill space.
1.
Separate waste materials for
[Reuse] [And] [Recycling] [_____] in accordance with Section [01 74 19 −
Construction Waste Management and Disposal] [_____]
.
2.
Remove from site and dispose of packaging materials at appropriate recycling facilities.
3.
Collect and separate for
disposal [Paper] [Plastic] [Polystyrene] [Corrugated cardboard] [_____] packaging
material [In appropriate onsite bins] [_____]
for recycling.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 01 Closeout Submittals
(Warranty).
PART 1.07
WARRANTY
A.
Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B.
Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document executed by
authorized company official. Manufacturer’s warranty is in addition to, and not a limitation of, other rights Owner may have
under Contract Documents.
Specifier Note: Coordinate paragraph below with manufacturer’s warranty requirements.
C.
Warranty: Commencing on Date of Installation.
1.
Compressor: Five years (limited).
2.
Other Covered Components: One year (limited).
PART 2 PRODUCTS
Specifier Note: Retain article below for proprietary method specification. Add product attributes, performance
characteristics, material standards and descriptions as applicable. Use of such phrases as or equal" or or approved
equal" or similar phrases may cause ambiguity in specifications. Such phrases require verification (procedural, legal and
regulatory) and assignment of responsibility for determining or equal" products.