
13
15-20kVA:
The UPS adopts positive and negative double battery framework, totally 16pcs (optional
18/20) in series. A neutral cable is retrieved from the joint between the cathode of the 16th
(17th/18th/19th/20 th) and the anode of the 17th (18th/19th/20th/21th) of the batteries. Then
the neutral cable, the battery Positive and the battery negative are connected with the UPS
respectively. The battery sets between the Battery anode and the neutral are called positive
batteries and that between neutral and cathode are called negative ones. The user can
choose the capacity and the numbers of the batteries according to their desire.
External battery connections for long-run units.
Note: The BAT+ of the UPS connect poles is connected to the anode of the positive battery,
the BAT-N is connected to the cathode of the positive battery and the anode of the negative
battery, the BAT- is connected to the cathode of the negative battery.
BAT-
Battery
breaker
Negative Battery
8(9/10)pieces
Positive Battery
8(9/10)pieces
BAT+
UPS connection
terminal block
BAT+ BATN BAT-
BAT-
Battery
breaker
Negative Battery
16(17/18/19/20)
pieces
Positive Battery
16(17/18/19/20)
pieces
BAT+
UPS connection
terminal block
BAT+ BATN BAT-
Summary of Contents for STARK 10 kVA
Page 51: ...51 ...
Page 52: ...www informups com ...