Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l’ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
60
OMW07096 REV. E
18) Once insertion is complete of the 18 trays, carry out the last operations to terminate connection.
Battery voltage
Ensure
the
BCB
switch is open.
19) From the right hand side of the UPS, partially extract tray no. 1, and before closing the jumper in
Picture 44 use a multimeter to check there is no DC voltage between the battery block terminals
to shunt with the jumper
Picture 44 - View from above Level No.1 with battery connections
Battery voltage
ATTENTION DANGEROUS VOLTAGE
After closing the jumper, dangerous voltage will be present on the battery terminals
represented in Figure 30.
20) Repeat the operation indicated in point no. 19 for the trays
no. 4-7-10-13-16
(Pict. 28-29).