Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l’ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
OMW07096 REV. E
43
7) On Level no. 2, insert trays no. 4-5-6 in compliance with the position as demonstrated in Picture 14.
NOTES:
On trays no. 4 and no. 6 check the circled jumper are not connected,
leave the circled jumper disconnected.
8) Wire level no. 2 as indicated in Figure 15.
Leave the circled jumpers disconnected.
Picture 14 - View from above Level No.2
Picture 15 - View from above Level No.2 with battery connections