15) On Level no. 6, insert tray no. 17 in compliance with the position and cabling as demonstrated
in Picture 41.
Picture 41 - View from above Level No.6 tray no. 17
NOTES:
On tray no.16 check the circled jumper is not connected,
leave the circled jumper disconnected.
16) Insert tray no. 16 by removing the circled jumper and inserting the jumpers as demonstrated in
Picture 42.