SBBI-2 Operating Information:
The SBBI-2 board allows the user to select the type of gate system it is used on with switching
programming. For this description the term ‘Single’ means one gate control board with one OR two
operators while ‘Double’ means a system with up to four operators running no more than two at a time.
A two leaf entry gate and a two leaf exit gate would be considered a ‘double’.
Items Included:
SBBI-2 Battery Back-Up with Enclosure
1250 Watt Tripp-Lite Voltage and Frequency Controlled Inverter (shipped separately)
Battery Charger/Maintainer
10 Foot Wiring Harness for:
Power Output from Battery Back-Up to Device Control System
Device Control Function Wiring – see note 1 at the top of page 2
2.5 Foot Lead-In Cables for Battery to Inverter Connection
100 Amp Fuse for Installation between Positive Battery Terminal and Inverter
Fuse Holder
Customer-supplied Items:
Battery (see page 3 for Selection Guidelines)
Battery Enclosure
Weather Resistant Enclosure Connectors
Commercial Power Input Wiring
Installation and Wiring Instructions
Inverter Installation:
1.
Unpack inverter from its box.
2.
Install inverter into enclosure below the shelf with the control panel facing you.
3.
Install
green
ground wire from back of pre-wire to
silver
ground terminal on inverter.
4.
Insert
red
(+) and
black
(-) 12VDC power leads from back of pre-wire into the positive and
negative terminals of the battery.
5.
Plug male inverter remote plug (RJ 45 plug) into receptacle on the face of the inverter.
6.
Plug the three prong cord into the socket on the inverter.
NOTE
: Leave inverters facing you until the battery is connected, and then turn the inverter so its control panel
is facing the right side of the enclosure, facing the battery
.