Commissioning log
Part 2 • Page 5-1
Part 2 – Supplementary Operating Instructions
Rev. 4.00 December 2014
Software version 1.04
EcoRO Dia I/II (HT)
Part 2 • Chapt
er 5
5.
Commissioning log
After the system has been commissioned, the following commissioning log is to be completed and signed
by the persons involved.
5.1
System parameters
The set system parameters are to be found in the commissioning log.
Changing process parameters (e.g. pressure, temperature, ....) may effect product water quality!
WARNING
At the time when the system is handed over, the pretreatment unit and the reverse osmosis
system are to be connected to the municipal drinking water network in accordance with
legislation and local regulations.
WARNING
If the plant and equipment are moved to another location, the operator is obliged to install
the entire system in compliance with the legal and local regulations applicable at the new
site.