
Rev. 4.00 December 2014
Software version 1.04
Part 2 • Page 1-2
Handover declaration for the operating instructions
Part 2 – Supplementary Operating Instructions
EcoRO Dia I/II (HT)
Part 2 • Chapter 1
1.4
System handover date
....................................................................................................................................
1.5
Maintenance and servicing personnel
The following persons have been named by the customer and have been instructed and trained on the
system by LMW and made aware of the following points:
protective equipment, dangerous areas, inadmissible operation, set-up, operation, maintenance and
repair.
....................................................................................................................................
Name (customer personnel)
Signature
....................................................................................................................................
Name (customer personnel)
Signature
....................................................................................................................................
Name (customer personnel)
Signature
⌧
LMW commissioning log
Customer-specific commissioning log
Company stamp/Customer's signature
1.6
The system was handed over to the customer by
Name, block letters
....................................................................................................................................
Date ...................................................
Signature ...................................................