Maintenance and operating logs
Part 2 • Page 8-9
Part 2 – Supplementary Operating Instructions
Rev. 4.00 December 2014
Software version 1.04
EcoRO Dia I/II (HT)
Part 2 • Chapt
er 8
8.7
Maintenance plan and technical safety check EcoRO Dia I/II (HT)
E07FB31_3
Dialysis centre ...........................................................
Serial number (SN) ...............................
Contact person ...........................................................
System type (Eco)RO Dia I
RO Dia I
(Eco)RO Dia II
RO Dia II
HT version (optional)
...........................................................
Number of modules, 1st stage ..............................
Postal code / city ...........................................................
Number of modules, 2nd stage ..............................
Inventory number .........................
Pump type M1 ..............................
Order number .........................
M2 ..............................
Date of manufacture ............./...........
M3 ..............................
Maintenance
Full maintenance
Technical safety check
Miscellaneous
Date: ..............................
1.
Pretreatment
Replaced
Carried out /
OK
Last
replacement
month / year
Values / Data / Remarks
M
FM
1.1
Overall visual assessment, inc. seals; complete
pretreatment
X
X
1.2
Water filter, rinsing type (optional)
1.2.1
Check degree of contamination (visual inspection)
X
X
1.2.2
Carry out rinsing operation (once per week)
X
X
1.3
Water monitor
1.3.1
Function check
X
1.4
Pipe disconnector
1.4.1
Function test, disconnection and flow setting
X
2.
Sand/iron filter (optional)
Type: ......................, SN: ....................
Replaced
Carried out /
OK
Last
replacement
month / year
Values / Data / Remarks
M
FM
2.1
Overall visual assessment inc. seals
X
X
2.2
Check control head for functioning
X
X
3.
Softener / Ion exchanger
Type: ......................, SN: ....................
Replaced
Carried out /
OK
Last
replacement
month / year
Values / Data / Remarks
M
FM
3.1
Overall visual assessment inc. seals
3.2
Start manual regeneration
X
X
3.3
Resin replacement every 10 years
(X)
3.4
Clean injector if required
X
X
3.5
Replace brine valve if required
X
X
3.6
Clean salt tank (annually)
X
X
3.7
Salt filling level
X
X
3.8
Set brine filling level
X
X
3.9
Raw water hardness
X
X
3.10
Soft water hardness < 1°dH / <17.8 ppm CaCO
3
X
X
3.11
Set capacity
X
X
3.12
Bypass valve setting (check)
X
X
3.13
Check control head for functioning
X
X
Type
Type
Type
cm
cm
°dH
°dH
m
3