ECO GOLD
22
Before putting the device into operation
25/08/2011/ YACE0088
Operation with cooling coil
For the optional operation with the cooling coil (LCZ 0720 and LCZ 0721) mount the cooling coil as follows:
Cut the thread with the enclosed screw
−
Cut the thread on the holed flange already before as-
sembly.
The cooling coil can only be mounted on one side of the con-
trol head. This is located on the side with the mains switch.
−
Withdraw the mains plug.
−
Use a soft underlay to avoid scratches to the upper side
of the control head.
−
To fit the cooling coil loosen the two cross-head screws
on the blind flange and remove it (see illustration).
−
Place the flange of the cooling coil in the position of the
removed blind flange and push the holed flange under-
neath it.
Holed
flange
−
With the two cross-head screws, mount the carrier plate
of the cooling coil and the holed flange to the underside
of the control head.
Please note: Use the cooling coil with cooling water only at operating temperatures below 100 °C.
At higher temperatures there is danger of hot steam forming.
For operation with an external consumer follow the connection instructions (
Ì