20/52
Installation/Uninstallation
© Gyr
D000030875 en q
– E350 series 2, 1-phase ZCF100Ax/Cx – User Manual
4
Installation/Uninstallation
4.1
Mounting the Meter
The meter should be mounted as follows on the meter board or similar
device provided for this purpose (see also section 3.4 "Dimensions"):
1.
Find the correct position for the meter. Ensure there are no wires
underneath the holes to be drilled.
2.
Define the desired form of fixing (open or covered meter mounting).
3.
Ensure with a phase tester or universal measuring instrument that the
connecting wires are not live.
105 mm
1
7
9
m
m
fo
r
o
p
e
n
m
o
u
n
ti
n
g
52.5 mm
1
5
5
m
m
fo
r
c
o
v
e
re
d
m
o
u
n
ti
n
g
Fig. 4.1 Drilling plan
4.
Mark the three fixing points (suspension triangle as shown in the
drilling plan Fig. 4.1) on the mounting surface provided.
5.
Drill the three holes.
6.
Unscrew the meter terminal cover.
7.
For open meter mounting, insert the meter suspension eyelet
– this is
supplied in the terminal cover
– into the corresponding opening at the
rear side of the meter until the suspension eyelet engages (see Fig. 4.2).
Fig. 4.2 Meter suspension eyelet
8.
Fit the meter with 3 fixing screws on the mounting surface provided.