General Maintenance
25
6.
Finish cleaning the area with pressurized water.
Inspecting After Clean-up
Once you are finished cleaning the hopper area, inspect your work:
1.
Check the following components for proper working order and/or alignment:
• Rollers
• Cylinder pins
• Hoses, pipes, connections, and cylinders (for leaks, etc.)
• Bolts (for thightness)
• Hopper floor and sidewalls (for excessive wear)
Figure 3-8 Inside the hopper area
2.
After inspection, put the floating panel back in place (see Figure 3-5).
3.
Use the stepladder to get down.
4.
Retract the stepladder.
5.
Start the engine, engage the hydraulic system and fully retract the packer.
6.
Retract the lifting arm alongside the vehicle.
Packer
The A
UTOMIZER
V
ERSA
H
AND
™ packing system relies on a heavy-duty guiding system and high-
strength steel wear plates. Because the packing system is put to such intensive use (1,000 to
3,000
cycles per day), Labrie Environmental Group recommends that
operators
perform a daily visual
inspection of the packer and its components.
Maintenance personnel
must
perform weekly inspection and maintenance. Greasing all moving parts
on a daily basis is very important and proper adjustment of the proximity switches is mandatory,
especially on vehicles equipped with a multi-cycle feature. For more information on the lubrication
schedule, see
Side rail
Packer
cylinder
Roller
Summary of Contents for Automizer Versa Hand
Page 1: ...AUTOMIZER VERSA HANDTM MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...AUTOMIZER VERSA HAND MAINTENANCE MANUAL...
Page 26: ...18 Safety...
Page 89: ...Lubrication 81 Figure 4 11 Lubrication chart Automizer...
Page 90: ...82 Lubrication Figure 4 12 Lubrication chart Versa Hand arm...
Page 94: ...86 Lubrication Figure 4 18 Cylinder retaining ring Cylinder retaining ring...
Page 95: ...Lubrication 87 Packer Lubrication Points...
Page 96: ...88 Lubrication Hopper Door Hopper door latch Hopper door hinges...
Page 105: ...Hydraulic System 97...
Page 127: ...Hydraulic System 119 Figure 5 29 Detecting cylinder internal leaks 1 2 3 4 5 A A A...
Page 128: ...120 Hydraulic System Main Hydraulic Schematic...
Page 129: ...Hydraulic System 121 Hydraulic Schematic 96 Gallon Gripper...
Page 130: ...122 Hydraulic System Hydraulic Schematic 300 Gallon Gripper...
Page 131: ...Hydraulic System 123...
Page 132: ...124 Hydraulic System...
Page 137: ...Electrical System 129 Electrical Schematics Console 1...
Page 138: ...130 Electrical System Console 2...
Page 139: ...Electrical System 131 Arm Control...
Page 140: ...132 Electrical System Chassis...
Page 141: ...Electrical System 133 Main Body...
Page 142: ...134 Electrical System Hopper...
Page 143: ...Electrical System 135 Arm...
Page 144: ...136 Electrical System...
Page 151: ...Pneumatic System 143 Pneumatic System Schematic...
Page 152: ...144 Pneumatic System...
Page 155: ...Troubleshooting 147 Figure 8 4 Ball end hex wrench metric and SAE...
Page 164: ...156 Troubleshooting Figure 8 9 Tailgate locking mechanism...
Page 166: ...158 Troubleshooting...
Page 189: ...Lifting Arm 181...