Rev. May 2001
GraviMaster-FGB-M05 (S)
Page 40
Gravimetric
Blender
The foot plate of the GraviMaster should be attached on a steel attachment plate on the frame
or mezzanine or fl ange pertinent to the machine.
The mounting holes are 9 mm and are positioned as shown in drawing 4.2
The unit should be mounted as stably as possible, in connection with the accuracy of the
loadcell.
Now mixer chamber, the weighbin and the front panel can be replaced.
Connect the air pressure to the regulator (max. 12 bar). Put the plugs of the GraviMaster and
the user interface in the sockets (220 V), these should be “clean”, without fl uctuations and it
must not be drawn off a 400 V wire. Then the communication cable should be plugged into
the user-interface and the control-box.
The raw material supply should be connected to the hoppers. For startup refer to section 1
of chapter 2.
Summary of Contents for FGB-M05
Page 17: ...Rev May 2001 GraviMaster FGB M05 S Page 16 Gravimetric Blender 2 9 EQ Net Certificate...
Page 18: ...Rev May 2001 GraviMaster FGB M05 S Page 17 Gravimetric Blender 2 10 ISO Certificat...
Page 50: ...Rev May 2001 GraviMaster FGB M05 S Page 49 Gravimetric Blender 7 5 Electrical diagrams...
Page 51: ...Rev May 2001 GraviMaster FGB M05 S Page 50 Gravimetric Blender...
Page 52: ...Rev May 2001 GraviMaster FGB M05 S Page 51 Gravimetric Blender...