
English
48
la Pavoni
6 . 2 0
6 . 2 0
6 . 2 0
6 . 2 0
6 . 2 0
Machine switching off
Machine switching off
Machine switching off
Machine switching off
Machine switching off
Automa tic pr ogrammed s witc hing of f
It is possib
le w hen the function
“ AUTOMATIC OPERATION”
(see “6.19.2 Functions description”) is active and the program-
ming of “ON/OFF TIME” (see 6.19.2 Functions description)
has also been carried out.
At the pr ogrammed time the mac
hine is set on
“STANDBY”.
Man ual s witc hing of f
This type of
switc hing of f is necessar
y w hen function
“AUTO-
MATIC OPERATION” (see “6.19.2 Functions description”) is
not activated.
It is obtained by setting both the main switch (ref.
10 , fig. 1)
and the multi-pole switch to position “
O” or disconnecting the
plug.
6 . 2 1
6 . 2 1
6 . 2 1
6 . 2 1
6 . 2 1
Disassembling/assembling
Disassembling/assembling
Disassembling/assembling
Disassembling/assembling
Disassembling/assembling
the cover panels
the cover panels
the cover panels
the cover panels
the cover panels
“CAUTION: To Reduce the Risk of Electric shock or Mechani-
cal Injury, Do Not Remove This Cover. No User Serviceable
Parts Inside. Repair and Cleaning Should Be Done By Autho-
rised Service Personnel Only (Only for USA and CDN mo-
dels).”
The side panels (ref. 1 and 5, fig. 11) and the back panel (ref.
3, fig. 11) can be dismantled for servicing or for customization
that may suit room furniture or wall painting.
Danger
Operation falling within the competence of the
Maintenance technician.
Disconnect the machine from mains by way of main switch
(ref. 10, fig. 1) and all-pole switch, or disconnecting the plug.
Danger of burns
Wait for the machine to cool off sufficiently, before
servicing it.
For parts removal, do the following:
-
Pull out the drip tray (ref. 15, fig. 11).
-
To unloose the upper screwes (ref. A, fig. 11) of fixing and
to release the lateral panels (ref. 1 and 5, fig. 11).
-
Slide glass out (ref. 2, fig. 11).
-
Dismantle the cup heating plate (ref. 4, fig. 11) by discon-
necting it from the electronic board, from the earth cable
and from the drain tube (ref. B, fig. 11).
-
Unscrew the back panel retaining nuts (ref. 3, fig. 11) and
dismantle it.
To re-assemble one must:
-
Assemble the back panel (ref. 3, fig. 11) and secure it with
the relative nuts.
-
Assemb le the cup hea
ting pla te (r ef. 4, fig . 11) b y inser ting
fig . 11
1
2
3
4
5
A
15
B
the electrical connector into the electr
onic boar d pr oper ly,
the fitting into the dr
ain tube (r
ef. B , fig . 11), and b y con-
necting the earth cable.
-
Assemb le one of the side panels (or r
ef. 1, fig . 11 or r ef. 5,
fig . 11).
Important
Firstly slide in the bottom pins in their frame slots,
after lock the screw of fixing.
-
Position the g
lass (r ef. 2, fig . 11) in the slot of
the la ter al
panel already assembled.
-
Assemble the other side panel.
-
Inser t the drip tr
ay into place (r
ef. 15, fig . 11).
-
Switch machine on.
6 . 2 2
6 . 2 2
6 . 2 2
6 . 2 2
6 . 2 2
Setting out of operatione
Setting out of operatione
Setting out of operatione
Setting out of operatione
Setting out of operatione
Danger
Operation falling within the competence of the
Maintenance technician.
When the machine is put out of operation, disconnect both
water and electrical mains; empty all trays, boilers and pipes
and clean the whole machine properly (see “7.2 Machine cle-
aning”).
In case of scrapping, the various materials used in manufac-
turing will have to be separated and individually disposed of,
according to each Country regulations in force.