16
Figure 20 – Removing the top cover
Step 6
Reinstall the front panel for the DCPS.
3.4
Installing a Ground Cable
Install a subrack ground cable into the rack by using M6x16 screws. Error! Reference source not found.
shows the subrack ground terminals.
Figure 21 – Subrack ground terminals
(1) Subrack ground terminals
3.5
(Optional) Installing Dry Contact Signal Cables
Procedure
Step 1
Press the contact plate using a flat-head screwdriver to flip the metal spring inside each dry
contact.
Step 2
Connect the signal cables to the corresponding dry contacts.
Step 3
Put away the flat-head screwdriver and check that the signal cables are securely connected.