Rigging procedures
4.
Secure the A10i-LIFT bars on the array.
a) Disconnect the rigging axis at the rear of A15i-LIFT.
b) Insert the stub at the front of the enclosure.
c) Insert the stub at the rear and secure the rigging axis.
5.
On each A10i-LIFT, secure a shackle to the desired pickup point.
A10i-LIFT pickup point
Select the same pickup point on each A10i-LIFT within an array of up to 6 enclosures.
For larger arrays, refer to
Radial arrays of 7 enclosures and more
(p.125).
6.
Raise the array until the bottom of the array is easily accessible.
A10i owner's manual (EN) version 1.0
77
Summary of Contents for A10i
Page 1: ...A10i owner s manual EN ...