Page
6
IM Easyfire 10/2008
© KWB – Kraft und Wärme aus Biomasse GmbH
Table of contents
Table of contents
11
FE “S” INCLINED WORM, FABRIC TANK .......................................................................... 109
11.1
Pellet storage room requirements (FE type S with fabric tank) ........................................................... 109
11.2
Installing the inclined worm extraction system....................................................................................110
11.2.1
FE connection on the burner
see point 10.7 ............................................................................................. 113
11.3 Final
inspection
....................................................................................................................................113
12
FE “S”, PELLET STIRRER PLUS, ELBOW WORM .............................................................. 115
12.1
Pellet storage room requirements (FE type S with Pellet Stirrer Plus) ............................................. 115
12.2
Installation instructions, FE type S .......................................................................................................116
12.3
Installing the pellet worm ....................................................................................................................116
12.4
Mounting the extensions .....................................................................................................................117
12.5
Installing the elbow worm ...................................................................................................................120
12.6
Installing the head piece with drop shaft .............................................................................................120
12.7
FE connection on the burner ................................................................................................................120
12.8
Installing the Stirrer Plus ......................................................................................................................120
12.9 Final
inspection
....................................................................................................................................124
13
FE “GS” SUCTION CONVEYOR, PELLET WORM ............................................................... 125
13.1
Requirements, pellet storage room (type GS fan, pellet worm, V-sloping floor) .................................. 125
13.2
Installing the pellet worm see point 10.3 ............................................................................................. 126
13.2.1
Connection, pellet worm – connecting piece ....................................................................................................... 126
13.2.2
Installing the pellet worm drive ............................................................................................................................ 127
13.3
Installing the transport hose ................................................................................................................127
13.3.1 Equipotential
bonding
.......................................................................................................................................... 127
13.3.2
Hose connection and grounding
(storage system) ................................................................................... 128
13.3.3 Fire
safety
............................................................................................................................................................ 129
13.3.4 Hose
connection
(boiler room) ............................................................................................................... 129
13.4 Final
inspection
....................................................................................................................................130
14
FE “GS” SUCTION CONVEYOR, PELLET STIRRER PLUS ................................................... 131
14.1
Pellet storage room requirements (FE type GS with Pellet Stirrer Plus) ............................................ 131
14.2
Installation instructions FE type GS .....................................................................................................132
14.3 Final
inspection
....................................................................................................................................132
15
FE “GL” LANCE, FABRIC TANK ......................................................................................... 133
15.1
Pellet storage room requirements (FE type GL with lance and fabric tank) ......................................... 133
15.2
Installation, removal pot with lance .....................................................................................................134
15.3
Lay out transport hose see point 13.3 .................................................................................................. 134
15.4
Fabric tank see section 9 ..................................................................................................................... 134
15.5 Final
inspection
....................................................................................................................................134
16
RA “GL” SUCTION CONVEYOR, LANCE WITH BURIED TANK .......................................... 135
16.1
Pellet storage room requirements (FE type GL, fan and lance with buried fabric tank) ....................... 135
16.2
Lay out transport hose see point 13.3 .................................................................................................. 136
16.3 Buried
tank
..........................................................................................................................................136
16.4 Final
inspection
....................................................................................................................................136
17
FUEL EXTRACTOR SYSTEM, TYPE R
pellet stirrer ....................................................................... 137
17.1
Requirements, pellet storage room (for type R) ................................................................................... 137
17.2
Install the fuel extractor (FE) ................................................................................................................138
17.3
FE connection on the burner see point 10.7. ........................................................................................ 142
17.4 Final
inspection
....................................................................................................................................142
18
TECHNICAL DATA SHEETS FOR SPECIALISTS ................................................................. 143
MA-Easyfire 10.2008_EN.indd 6
MA-Easyfire 10.2008_EN.indd 6
30.03.2009 13:29:42 Uhr
30.03.2009 13:29:42 Uhr