
© KWB – Kraft und Wärme aus Biomasse GmbH
IM Easyfire 10/2008
Page
133
15 Suction conveyor, lance + fabric tank
15 Suction conveyor, lance + fabric tank
15
FE “GL” LANCE, FABRIC TANK
Ceiling opening
;
70 mm
Fire-safety collar
If the fabric tank will be set up in a separate room,
ventilation with at least 400 cm2 must be provided.
Solid ceiling F90
Solid ceiling F90
Outline
USP GL with fabric tank
and suction system
Pellet transport hose
max. length 25 m
No sharp
objects above
the fabric tank
Min. 30
without step max. 300
Boiler
Room
Pellet Storage Room
15.1
Pellet storage room requirements
(FE type GL with lance and fabric tank)
Comply with the instructions in points 1.3 to 1.3.2 in the introduction!
Boiler room and storage room construction – KWB Easyfire GL
Fabric tank
Storage room d
T30 80/120
Extraction pot
with lance
Storage room door
T30 80/120
MA-Easyfire 10.2008_EN.indd 133
MA-Easyfire 10.2008_EN.indd 133
30.03.2009 13:31:25 Uhr
30.03.2009 13:31:25 Uhr