
Page
24
IM Easyfire 10/2008
© KWB – Kraft und Wärme aus Biomasse GmbH
2 System installation
2 System installation
3.) I ntroduce the ash worm into the rear bearing bush – secure the
ash worm
Turn the ash worm in the bearing bush until the stop.
Pull the adjusting ring forward. Maintain 2 mm clearance to the middle
bearing (play in the longitudinal movement).
Tighten the bolt in the adjusting ring.
Adjust the middle bearing until the ash worm can be turned by hand.
Bearing arrangement of the ash worm
Install and cable the ash worm motor (rear of boiler).
4.) Connect the ash worm motor
Connect the ash worm motor.
Diagram EBAA1031, section 17
Fasten the cable tie on the motor (strain relief).
Cabling, drive
5.) Thread on the sealing plate
Thread on the sealing plate
6.) Install the ash worm motor
Slide the drive shaft into the ash worm from the rear.
The gear unit will be pointing upward.
Screw the ash worm motor with sealing plate onto the holder bracket.
Installation, ash worm motor
7.) Mount the cover for the ash worm motor
Ensure that the cable is properly routed.
Lay the cable within the cladding.
Screw down the cover.
(screws are included in the scope of delivery)
Installation, drive cover
MA-Easyfire 10.2008_EN.indd 24
MA-Easyfire 10.2008_EN.indd 24
30.03.2009 13:29:56 Uhr
30.03.2009 13:29:56 Uhr