© KWB – Kraft und Wärme aus Biomasse GmbH
18.1 Dimension sheets
18.1 Dimension sheets
Installation example, KWB Easyfire GL
with suction conveyor unit and lance
TDB-EBB-USP-Einbaubsb. 7_B sheet 7/11
Buried Tank
Protective pipe HT pipe
at least
;
15 cm
Ceiling opening
;
70 mm
Fire-safety collar
Solid ceiling F90
fabric tank
nk
Pellet transport hose
max. length 25 m
lift without step 3 m
st after 3 m height difference 1 m route horizontally
or hose bend radii at least 30 cm.
Ceiling opening
;
70 mm
Fire-safety collar
ventilation with at least 400 cm2 must be provided.
Solid ceiling F90
Solid ceiling F90
fabric tank
system
Pellet transport hose
max. length 25 m
Min. 30
without step max. 300
Boiler
Room
Pellet Storage Room
Outline
USP GL with fabric tank
and suction system
If the fabric tank will be set up in a separate room,
ventilation with at least 400 cm2 must be provided.
No sharp
objects above
the fabric tank
Hose installation (valid for all versions of the suction conveyor):
Back-up prevention:
• Max. delivery head
• At the latest after a 3 mm height differential route 1 m
horizontal
• Max. total delivery head 5 m
• Max. length of the transport hose 25 m
Fastening:
• Max. distance between holders 80 cm
• the hose should not sag between holders
• Do not mechanically stress the conveyor hose
(e.g. twist, crush, etc.
• Do not install the conveyor hose near hot surfaces
• All conveyor hose bend radii at least 30 cm