Operation
75
Inspection tasks
during soil prepa-
ration
During soil preparation, use the check list to examine the following:
Does the PTO speed remain constant during soil preparation?
From time-to-time, climb down and check the following:
Degree of soil comminution
Working depth for the power harrow
Adjustment of the side plates
Working depth of the track eradicator
Adjustment of the levelling bar
Settings on the Hydrolift
Gear-box temperature
Trough temperature