Attaching the machine
40
Hydrolift [+]
The Hydrolift can transfer lifting forces of up to 1600 kg, depending on
the model.
Connect the hydraulic line of the Hydrolift to the tractor
Lower the Hydrolift fully
Adjust the lower link connections to the dimensions of the seeding
machine
Remove the R-pin from the locking pin
Remove the locking pin
Align the tractor with the power harrow centred in front of the seed-
ing machine
Drive backwards slowly. The lower link connections from the trac-
tor must be located below the lower link connections on the seed-
ing machine
Lift the Hydrolift and ensure the arrester hooks are securely locked
in place
Insert the locking pin and secure with an R-pin
Fasten the top link to the seeding machine and secure
Lower the entire machine combination to work position
Adjust the length of the top link so that the seeding machine is in
its prescribed alignment with the ground
Using the Hydrolift with PTO-driven seeding machines
In the event of excessive lift with the Hydrolift, the PTO shaft would
move out of its prescribed operating position and would be dam-
aged
Failure to observe these instructions may result in serious or fatal
injuries.
Arrester hook
Top link
Locking pin
R-pin