8. - Instructions for work
MERGE MAXX 950
77
KN233BGB_C
Merger
Central windrow de Right windrow
delivery
From the central windrow delivery configuration.
- Press key F3:
• Belt rotation stops (by time delay).
then
• Activation of conveyor belts and pickups: LH
conveyor (direction of rotation to the right).- RH
conveyor (direction of rotation to the right).
The time delay during which the conveyor belt
direction of rotation is inverted can be adjusted.
At headlands, press the selection key to pass to the
mode for turning windrows to the left.
The time delay during which the conveyor belt
direction of rotation is inverted can be adjusted.