MERGE MAXX 950
110
10. - Maintenance and storage
KN233BGB_C
Merger
- Reinstall pin (2) and pin (1).
- Push lever (2) to stretch the conveyor belt.
- Reinstall R-clip (1).
- Check the conveyor belt tension.
- Repeat procedure if necessary.
- Measure dimension x.
The tension is correct when central bar (1) of
the conveyor belt is located at approximately
15 mm (0.6’’) from the side guides (2).
2
1
1
2
=
=
x
1
2