5 Installation at Site
32 of 116
CHTRa
Fig. 15:
Preparing the adjusting screws (example)
1
Foundation centreline
2
Adjusting screws
3
Foundation holes
4
Baseplate
5
Foundation
H
max. 47 mm / min. 35 mm
5.9 Installing the pump set
DANGER
Static charging due to insufficient potential equalisation
Explosion hazard!
▷
Make sure that the connection between pump and baseplate is electrically
conductive.
DANGER
Improper transport
Danger to life from falling parts!
▷
Observe the safety regulations for transport work. (
▷
Observe the applicable local occupational safety and accident prevention
regulations.
5.9.1 Securing the baseplate with foundation bolts
1. Lift the baseplate.
2. Place the foundation bolts into the baseplate holes and screw on the nuts until
the bolt thread projects by about 10 mm.
3. Place the baseplate onto the levelling screws and align the baseplate using the
screws. Check the alignment in relation to the foot supporting surfaces both
parallel to and 90° to the foundation centreline using a spirit level (accuracy <
0.3 mm/m). The foundation bolts must be suspended freely in the foundation
holes.
4. Position on the baseplate the pump set components which are not already
mounted on it. Observe the manufacturer's product literature.
5. Check the baseplate alignment once again in relation to the foot supporting
surfaces both parallel to and 90° to the foundation centreline using a spirit level
(accuracy < 0.3 mm/m). Correct any deviations which might have occurred under
the load of the components using the levelling screws.