9 Related Documents
112 of 126
Amacan S
1589.837/01-EN
Loss diagram
0,1
0,2
0,3
0,4 0,5 0,6
0,8 1
2
3
4
5
6
Q [m
3
/s]
0,1
0,2
0,3
0,4
0,5
0,6
0,8
1,0
2,0
H
V ges
[m]
2,5
1
2
3
4
5
6
7
8
9
11 12
13
14
15
16
17
10
8
①
- DN
2
= 200 mm
②
- DN
2
= 250 mm
③
- DN
2
= 300 mm
④
- DN
2
= 350 mm
⑤
- DN
2
= 400 mm
⑥
- DN
2
= 500 mm
⑦
- DN
2
= 600 mm
⑧
- DN
2
= 700 mm
⑨
- DN
2
= 800 mm
⑩
- DN
2
= 900 mm
⑪
- DN
2
= 1000 mm
⑫
- DN
2
= 1100 mm
⑬
- DN
2
= 1200 mm
⑭
- DN
2
= 1300 mm
⑮
- DN
2
= 1400 mm
⑯
- DN
2
= 1500 mm
⑰
- DN
2
= 1600 mm
Calculation formulas:
H = H
geo
+ ∆ H
v
∆ H
v
- Loss in the riser (pipe friction)
- H
v ges.
(see diagram)
H
V ges.
comprises:
▪
Elbow
▪
Discharge pipe length = 5 x DN
2
▪
Swing check valve
▪
Outlet losses v
2
/2g
Minimum water level diagram
Covered chamber
4000
3000
2500
1600
1200
1000
900
800
700
600
500
400
0,1
0,2
0,3 0,4 0,5 0,6 0,8 1
1,5
2,5 3
4
5
6 7 8
2
2000
t1 [mm]
Q [m
3
/s]
Minimum water level
Summary of Contents for Amacan S 1000-600
Page 125: ......